A platform for research: civil engineering, architecture and urbanism
Germany rebuilds Minden canal-bridge destroyed by retreating Wehrmacht
Illustrated description of reconstruction of 1175-ft Minden aqueduct consisting of 8 reinforced concrete spans, two of which were destroyed; reconstruction performed by prefabricated reinforced concrete inverted T sections; 30 hydraulic jacks used to realign transition pier, that had been tilted.
Germany rebuilds Minden canal-bridge destroyed by retreating Wehrmacht
Illustrated description of reconstruction of 1175-ft Minden aqueduct consisting of 8 reinforced concrete spans, two of which were destroyed; reconstruction performed by prefabricated reinforced concrete inverted T sections; 30 hydraulic jacks used to realign transition pier, that had been tilted.
Germany rebuilds Minden canal-bridge destroyed by retreating Wehrmacht
Eng News-Rec
Engineering News-Record ; 143
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1999
Engineering Index Backfile | 1930
Weser Drop of the Mittelland Canal at Minden
Engineering Index Backfile | 1928
|New Aspern bridge crossing Danube canal in Vienna, to replace bridge destroyed during war
Engineering Index Backfile | 1953
|Online Contents | 2011