A platform for research: civil engineering, architecture and urbanism
Six weeks' steel-erection job completed in ten days
How emergency situation, created by Fraser River floods, was met by B C Dept of Public Works; erection of new $75,000 steel span bridge over Vedder River, 60 mi from Vancouver, BC; bridge has main span 190 ft long and 19 ft wide; steel weighs 150 tons; work took 10 days.
Six weeks' steel-erection job completed in ten days
How emergency situation, created by Fraser River floods, was met by B C Dept of Public Works; erection of new $75,000 steel span bridge over Vedder River, 60 mi from Vancouver, BC; bridge has main span 190 ft long and 19 ft wide; steel weighs 150 tons; work took 10 days.
Six weeks' steel-erection job completed in ten days
Roads Bridges
Roads and Bridges ; 87
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Superstructure Completed in Just Eight Weeks
British Library Online Contents | 2000
|Desert airbase completed in five weeks
Engineering Index Backfile | 1944
British Library Conference Proceedings | 1996
|British Library Conference Proceedings | 1995
|Erection of Steel Superstructure
ASCE | 2021
|