A platform for research: civil engineering, architecture and urbanism
New bridge over Mosel river at Schweich, Germany, made of precast concrete parts
Total length of 145.20 m between land abutments divided into three spans, 46 m each measured between piers; stress analysis of main ribs based on two-hinge arch.
New bridge over Mosel river at Schweich, Germany, made of precast concrete parts
Total length of 145.20 m between land abutments divided into three spans, 46 m each measured between piers; stress analysis of main ribs based on two-hinge arch.
New bridge over Mosel river at Schweich, Germany, made of precast concrete parts
Die neue Bruecke ueber die Mosel bei Schweich
Vaessen, F. (author)
Bauingenieur ; 24
1949
6 pages
Sectional drawings, Photographs
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Treis Bridge over the Mosel River
Engineering Index Backfile | 1930
|Reconstruction of double track railroad bridge over Mosel River, near Eller, Germany
Engineering Index Backfile | 1957
|Adolph Hitler bridge over Mosel River at Koblenz
Engineering Index Backfile | 1934
|Adolph Hitler bridge over Mosel River at Koblenz
Engineering Index Backfile | 1934
|