A platform for research: civil engineering, architecture and urbanism
Contractor meets close design tolerances in building long-span concrete arch bridge
Podolsko bridge over Vltava River, Czechoslovakia, has main arch of 492 ft clear span, and 8 additional arches of 121 ft each; width of deck 27 ft 11 in. with two lanes and two sidewalks; design checked by photoelastic model tests; solid concrete arch with uniform thickness of 6 ft 6 3/4 in.; data on scaffolding, stress analysis and construction procedure.
Contractor meets close design tolerances in building long-span concrete arch bridge
Podolsko bridge over Vltava River, Czechoslovakia, has main arch of 492 ft clear span, and 8 additional arches of 121 ft each; width of deck 27 ft 11 in. with two lanes and two sidewalks; design checked by photoelastic model tests; solid concrete arch with uniform thickness of 6 ft 6 3/4 in.; data on scaffolding, stress analysis and construction procedure.
Contractor meets close design tolerances in building long-span concrete arch bridge
Civ Eng (NY)
Polivka, J.J. (author)
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete arch bridge meets many problems
Engineering Index Backfile | 1954
|Seven-span reinforced concrete arch bridge
Engineering Index Backfile | 1933
|Seven-span reinforced concrete arch bridge
Engineering Index Backfile | 1933
|Long span concrete arch design in France
Engineering Index Backfile | 1924
|