A platform for research: civil engineering, architecture and urbanism
Bridge over Danube river with total length of 399.- 74 m consists of three steel trusses with span of 80.23 m and two of 57.24 m, six nailed timber girders and spans of 28 m each, and three nailed timber trusses of from 10.35 to 12.93-m span; concrete piers built within reinforced concrete cofferdam; stress analysis.
Bridge over Danube river with total length of 399.- 74 m consists of three steel trusses with span of 80.23 m and two of 57.24 m, six nailed timber girders and spans of 28 m each, and three nailed timber trusses of from 10.35 to 12.93-m span; concrete piers built within reinforced concrete cofferdam; stress analysis.
Construction of Kossuth bridge in Budapest
Structural Engr
Szechy, C. (author)
Structural Engineer ; 26
1948
20 pages
Photographs, Drawings
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of new Margaret bridge, Budapest
Engineering Index Backfile | 1948
|Design and construction of new Margaret bridge, Budapest
Engineering Index Backfile | 1947
|Bridge reconstruction in Budapest
Engineering Index Backfile | 1950
Engineering Index Backfile | 1936