A platform for research: civil engineering, architecture and urbanism
Centenary of Newcastle high level bridge
Two-decked bridge over River Tyne at Newcastle officially opened for railway traffic Sept 28 1849; it is 1337 1/2 ft long with six clear spans, each of 125 ft and eight masonry approach spans; upper deck carries three railway tracks and lower deck carries roadway with double tramway; each span consists of four cast iron tied arches.
Centenary of Newcastle high level bridge
Two-decked bridge over River Tyne at Newcastle officially opened for railway traffic Sept 28 1849; it is 1337 1/2 ft long with six clear spans, each of 125 ft and eight masonry approach spans; upper deck carries three railway tracks and lower deck carries roadway with double tramway; each span consists of four cast iron tied arches.
Centenary of Newcastle high level bridge
Engineer
Engineer ; 188
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
British Library Online Contents | 2013
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1928
Engineering Index Backfile | 1927