A platform for research: civil engineering, architecture and urbanism
Flexibility features concrete handling on Seattle-Tacoma airport building
Building of reinforced concrete covers 71,000 sq ft; portable 60-cu yd batching plant used for dry mixing of concrete materials; concreting tower has max height of 105 ft and boom of portable crane is 85 ft long; capacity of air terminal planned to handle 60 plane movements per hour.
Flexibility features concrete handling on Seattle-Tacoma airport building
Building of reinforced concrete covers 71,000 sq ft; portable 60-cu yd batching plant used for dry mixing of concrete materials; concreting tower has max height of 105 ft and boom of portable crane is 85 ft long; capacity of air terminal planned to handle 60 plane movements per hour.
Flexibility features concrete handling on Seattle-Tacoma airport building
Concrete
Concrete ; 57
1949
2 pages
Photographs of construction stages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Nighttime Cement Concrete Pavement Replacement: Seattle-Tacoma International Airport
British Library Conference Proceedings | 1994
|A Noise Remedy Program: Seattle-Tacoma International Airport
British Library Conference Proceedings
|Scrapers move 6 million yards at Seattle-Tacoma airport
Engineering Index Backfile | 1943
Seismic Retrofit of Seattle-Tacoma International Airport Terminal Area Bridges
British Library Conference Proceedings | 1998
|