A platform for research: civil engineering, architecture and urbanism
Features of Nottingham Intake under construction include submerged crib, 10-ft diam concrete pipe intake and 1 1/2-mi land section of intake, to be built as 10-ft diam free air tunnel; capacity of works 150 mgd; all welded 76-ft diam steel drum intake will weigh 1100 tons when sunk in final position and ballasted with concrete; pictorial data on tunneling in hard gray shale.
Features of Nottingham Intake under construction include submerged crib, 10-ft diam concrete pipe intake and 1 1/2-mi land section of intake, to be built as 10-ft diam free air tunnel; capacity of works 150 mgd; all welded 76-ft diam steel drum intake will weigh 1100 tons when sunk in final position and ballasted with concrete; pictorial data on tunneling in hard gray shale.
Steel-drum crib for Cleveland intake
Eng News-Rec
Burger, A.A. (author)
Engineering News-Record ; 141
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Intake Crib Rehab Saves $6 Million
Online Contents | 1993
|New intake crib for Chicago gives increased water supply
Engineering Index Backfile | 1929
|New tunnels, intake crib, and pumping stations, Chicago, Ill
Engineering Index Backfile | 1899