A platform for research: civil engineering, architecture and urbanism
California plants freeway side slopes
Economy of maintenance of Santa Ana Freeway obtained by reducing erosion through side slope stabilization; recent improved methods include use of wooden frames; data on step by step stabilization methods for 1:1, 1 1/2:1 and 2:1 or flatter slopes.
California plants freeway side slopes
Economy of maintenance of Santa Ana Freeway obtained by reducing erosion through side slope stabilization; recent improved methods include use of wooden frames; data on step by step stabilization methods for 1:1, 1 1/2:1 and 2:1 or flatter slopes.
California plants freeway side slopes
Eng News-Rec
Engineering News-Record ; 140
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
California Freeway near completion
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1959
|Freeway Access Management Practices in California
ASCE | 2015
|Freeway development on highways of California
Engineering Index Backfile | 1946
Structural failures on the Santa Monica Freeway, California
British Library Conference Proceedings | 1994
|