A platform for research: civil engineering, architecture and urbanism
B. and B. gangs must be fully mechanized
Article is based on letter received in answer to request, sent to bridge and building supervisory officers, for expressions of opinion regarding mechanization of bridge and building work; recommended list of power tools for 8-man gang; savings and other advantages to be expected from mechanization of this work; effect of high labor costs on need for more machines.
B. and B. gangs must be fully mechanized
Article is based on letter received in answer to request, sent to bridge and building supervisory officers, for expressions of opinion regarding mechanization of bridge and building work; recommended list of power tools for 8-man gang; savings and other advantages to be expected from mechanization of this work; effect of high labor costs on need for more machines.
B. and B. gangs must be fully mechanized
Ry Eng Maintenance
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Big tunnel-lining job fully mechanized
Engineering Index Backfile | 1949
Online Contents | 2014
|Coal mine fully-mechanized excavation structure, track and method
European Patent Office | 2023
|Pneumatic control fence control group for fully-mechanized excavating
European Patent Office | 2023
|The Basic Problems about Fully-Mechanized Top-Coal Caving System
British Library Conference Proceedings | 2012
|