A platform for research: civil engineering, architecture and urbanism
Procedure adopted in joining 50-ft and 25-ft piles, using welded reinforcement and rapid hardening concrete; after driving 50 ft pile until head is within two feet of ground level, top is cut back 12 in.; exposed reinforcement is then concreted with dryest mix practicable.
Procedure adopted in joining 50-ft and 25-ft piles, using welded reinforcement and rapid hardening concrete; after driving 50 ft pile until head is within two feet of ground level, top is cut back 12 in.; exposed reinforcement is then concreted with dryest mix practicable.
Splicing of reinforced concrete piles
Commonwealth Engr
Antill, J.M. (author)
1948
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Splicing reinforced concrete piles
Engineering Index Backfile | 1949
|Engineering Index Backfile | 1945
Splicing of Precast-Prestressed Concrete Piles
NTIS | 1974
Engineering Index Backfile | 1947
|