A platform for research: civil engineering, architecture and urbanism
Development of head of Lavey at rhone river, Switzerland
Hydraulic data; geological conditions necessitated caisson foundation of dam; pictorial report on construction work; dam is equipped with gate 13 m wide, 11 m high.
Development of head of Lavey at rhone river, Switzerland
Hydraulic data; geological conditions necessitated caisson foundation of dam; pictorial report on construction work; dam is equipped with gate 13 m wide, 11 m high.
Development of head of Lavey at rhone river, Switzerland
Amenagement de la chute de Lavey (Suisse) sur le Rhone
Walther, R. (author)
Houille Blanche ; 2
1947
8 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Barrage de Lavey. Études physique et numérique des écoulements et du transport solide dans le Rhône
Online Contents | 2011
|Refurbishment of the Lavey hydroelectric scheme
British Library Conference Proceedings | 1993
|Moerel hydroelectric power plant on Rhone River, Switzerland
Engineering Index Backfile | 1946
|Rhone River wooden bridge between Lavey and Moritz, Switzerland;
Engineering Index Backfile | 1941
|Engineering Index Backfile | 1937
|