A platform for research: civil engineering, architecture and urbanism
History of Genissiat hydro plant which exploits 300 mi of Rhone valley; concrete gravity dam, 345 ft high, was built between two rock filled cofferdams while river was diverted through tunnels; open cut spillway will handle maximum flow of 95,000 cfs; power house designed for 400,000 kw in six turbine generator units; illustrated description of mixing, distributing and placing of concrete for Genissiat dam.
History of Genissiat hydro plant which exploits 300 mi of Rhone valley; concrete gravity dam, 345 ft high, was built between two rock filled cofferdams while river was diverted through tunnels; open cut spillway will handle maximum flow of 95,000 cfs; power house designed for 400,000 kw in six turbine generator units; illustrated description of mixing, distributing and placing of concrete for Genissiat dam.
Western Europe's biggest power dam
Eng News-Rec
Bowman, W.G. (author)
Engineering News-Record ; 140
1948
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Acer designs "Europe's biggest" sewage treatment works.
Online Contents | 1995
Western claims biggest computing power
Online Contents | 1995
How we tackled Europe's biggest peace time blaze
British Library Online Contents | 2006
|Berlin: Europe's biggest worksite. Foundation works for new transport facilities
Online Contents | 1999
|Europe's Biggest - Who'll pay for the Seine-Nord Europe Canal
Online Contents | 2008
|