A platform for research: civil engineering, architecture and urbanism
Western Motorway, Paris de Buffevent
Illustrated report on new highway forming western exit from Paris, France; data on St Cloud compound arch tunnel built of concrete and masonry; notes on foundation on ground with poor bearing capacity; 7 m and 9 m wide road consists of two concrete slabs; longitudinal joints are of saturated wood board carrying 16 mm (5/8 in.) diam dowel bars spaced 40 cm (1 ft 3 3/4 in.) apart. From Science et Industrie (date not specified).
Western Motorway, Paris de Buffevent
Illustrated report on new highway forming western exit from Paris, France; data on St Cloud compound arch tunnel built of concrete and masonry; notes on foundation on ground with poor bearing capacity; 7 m and 9 m wide road consists of two concrete slabs; longitudinal joints are of saturated wood board carrying 16 mm (5/8 in.) diam dowel bars spaced 40 cm (1 ft 3 3/4 in.) apart. From Science et Industrie (date not specified).
Western Motorway, Paris de Buffevent
Roads Road Construction
1948
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Completion of the A86 motorway west of Paris
British Library Online Contents | 2002
|AUTOROUTES: Completion of the A86 motorway west of Paris
Online Contents | 2002
|Dwellings along the périphérique motorway, Paris 19, Ch. Hauvette
Online Contents | 1996
Launched structures of motorway A19 (Sens-Courtenay) - A6 (Paris-Lyon)
British Library Online Contents | 1999
|Closing the Gap in the second Motorway Ring around Paris
British Library Online Contents | 1998