A platform for research: civil engineering, architecture and urbanism
Wooden dam with flash flood protection
After log crib dam with inadequate spillway capacity had to be demolished to protect lumber mill from destruction by unprecedented 20,000-sec-ft flood, rock and timber crib dam was built that had provisions for quickly removing some 10 ft of flashboards should similar emergency occur; timber dam was built from materials available nearby and mill was thus back in production in relatively short time.
Wooden dam with flash flood protection
After log crib dam with inadequate spillway capacity had to be demolished to protect lumber mill from destruction by unprecedented 20,000-sec-ft flood, rock and timber crib dam was built that had provisions for quickly removing some 10 ft of flashboards should similar emergency occur; timber dam was built from materials available nearby and mill was thus back in production in relatively short time.
Wooden dam with flash flood protection
Eng News-Rec
Engineering News-Record ; 140
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Protection of the city of Gdansk against flash flood (Flood 2001)
British Library Conference Proceedings | 2006
|Flash flood in Slovenia in 1990: damage and protection
British Library Conference Proceedings | 1994
|British Library Conference Proceedings | 1997
|Wooden wall assemblies for fire protection design with wooden fiber insulation
European Patent Office | 2023
|Improved Flash Flood Predictions
British Library Conference Proceedings | 2001
|