A platform for research: civil engineering, architecture and urbanism
Clark dam, Tasmania: investigations undertaken preparatory to its design and construction
Report on investigations undertaken in connection with design of 200 ft high concrete arch dam now under construction; data on geological and hydrographic conditions; joints are spaced at 50 ft measured on upstream face; description of installation of artificial cooling system for concrete.
Clark dam, Tasmania: investigations undertaken preparatory to its design and construction
Report on investigations undertaken in connection with design of 200 ft high concrete arch dam now under construction; data on geological and hydrographic conditions; joints are spaced at 50 ft measured on upstream face; description of installation of artificial cooling system for concrete.
Clark dam, Tasmania: investigations undertaken preparatory to its design and construction
Instn Engrs Australia -- J
Thomas, H.H. (author)
1948
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of clark dam on Derwent river, butlers Gorge, Tasmania
Engineering Index Backfile | 1950
|Clark dam [midline ellipsis] investigations and design
Engineering Index Backfile | 1947
The preparatory period in hydropower construction
Springer Verlag | 1975
|The preparatory period in hydropower construction
Online Contents | 1975
|