A platform for research: civil engineering, architecture and urbanism
Upstream face of dam refaced with precast slabs
Repairs effected at Barker Dam of Public Service Co of Colorado; unique construction project involved draining of reservoir and chipping and drilling dam face; 1000 precast concrete slabs are cemented to face to renew surface.
Upstream face of dam refaced with precast slabs
Repairs effected at Barker Dam of Public Service Co of Colorado; unique construction project involved draining of reservoir and chipping and drilling dam face; 1000 precast concrete slabs are cemented to face to renew surface.
Upstream face of dam refaced with precast slabs
Elec World
Card, L.B. (author)
Electrical World ; 128
1947
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Face forms unnecessary with precast concrete slabs
Engineering Index Backfile | 1940
Precast concrete slabs face bridge abutments
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
Reservoir construction with precast slabs
Engineering Index Backfile | 1947
Engineering Index Backfile | 1946