A platform for research: civil engineering, architecture and urbanism
Reinforced-concrete chimney and offices at valley power-station of Bradford corporation
Factors which affected choice and dimensions of reinforced concrete chimney of steam power station; data on test bores and pile foundation; description of construction and statical analysis; shaft, ranging in thickness from 9 in. at bottom to 6 in. at top has 4 1/2 in. brick lining; notes on lightning protection. (see also Eng and Boiler House Rev v 63 n 3 Mar 1948 p 80-5; Civ Engrs Rev Apr 1948 p 122-4)
Reinforced-concrete chimney and offices at valley power-station of Bradford corporation
Factors which affected choice and dimensions of reinforced concrete chimney of steam power station; data on test bores and pile foundation; description of construction and statical analysis; shaft, ranging in thickness from 9 in. at bottom to 6 in. at top has 4 1/2 in. brick lining; notes on lightning protection. (see also Eng and Boiler House Rev v 63 n 3 Mar 1948 p 80-5; Civ Engrs Rev Apr 1948 p 122-4)
Reinforced-concrete chimney and offices at valley power-station of Bradford corporation
Instn Civ Engrs -- J
Carr, T.H. (author)
1948
21 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced-concrete chimney and offices at valley power-station of Bradford corporation
Engineering Index Backfile | 1948
|Reinforced-concrete chimney and offices at valley power-station of Bradford corporation
Engineering Index Backfile | 1948
|Reinforced concrete chimney at valley power station Bradford
Engineering Index Backfile | 1949
|Construction of reinforced concrete chimney and offices
Engineering Index Backfile | 1951
|Reinforced-concrete chimney towers at Barton Power-Station
Engineering Index Backfile | 1936
|