A platform for research: civil engineering, architecture and urbanism
Dual 12 1/3 mile cableway to haul aggregates for Australian Dam
Warragamba Dam, New South Wales, 400 ft high, will require 1 1/2 million cu yd of concrete; ropeway, 12.3 mi long, installed for its transport; constant speed of buckets, each loaded with 2750 lb is 510 ft per min; data on cableway construction and operation.
Dual 12 1/3 mile cableway to haul aggregates for Australian Dam
Warragamba Dam, New South Wales, 400 ft high, will require 1 1/2 million cu yd of concrete; ropeway, 12.3 mi long, installed for its transport; constant speed of buckets, each loaded with 2750 lb is 510 ft per min; data on cableway construction and operation.
Dual 12 1/3 mile cableway to haul aggregates for Australian Dam
Concrete
Fletcher, H.B. (author)
Concrete ; 56
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
45-mile cableway diverts freight from highway
Engineering Index Backfile | 1937
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1922
|