A platform for research: civil engineering, architecture and urbanism
Semi-permanent bridges in flooded border country
Further particulars of construction of Bailey bridges by Royal Engineers, to replace bridges washed away in England and Scotland owing to heavy rainfall Aug 12-13; particular reference to bridge which will span 420-ft gap over Whiteadder Water, Northumberland; proposed bridge will comprise 101-ft triple truss span, 102-ft triple truss span, 82-ft span (mainly double truss); 82-ft double truss span; and 71-ft double truss span.
Semi-permanent bridges in flooded border country
Further particulars of construction of Bailey bridges by Royal Engineers, to replace bridges washed away in England and Scotland owing to heavy rainfall Aug 12-13; particular reference to bridge which will span 420-ft gap over Whiteadder Water, Northumberland; proposed bridge will comprise 101-ft triple truss span, 102-ft triple truss span, 82-ft span (mainly double truss); 82-ft double truss span; and 71-ft double truss span.
Semi-permanent bridges in flooded border country
Engineering
Engineering ; 166
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Semi-permanent bridges over rhine at Mainz
Engineering Index Backfile | 1947
PERMANENT MIGRANTS AND CROSS-BORDER WORKERS: THE EFFECTS ON THE HOST COUNTRY
Online Contents | 1999
|Engineering Index Backfile | 1923
British Library Online Contents | 1996
|Online Contents | 2010