A platform for research: civil engineering, architecture and urbanism
Construction d'un pont en beton arme a Mytho (Cochinchine)
Construction of bridge of reinforced concrete at Mytho, Cochin-China, by launching prefabricated main girders; bridge is of hinged girder type; end spans are 20 m plus two cantilevers of 4 and 4.3 m, respectively; middle span which rests on inner cantilever of end spans is 12 m long; illustrated description of launching procedure.
Construction d'un pont en beton arme a Mytho (Cochinchine)
Construction of bridge of reinforced concrete at Mytho, Cochin-China, by launching prefabricated main girders; bridge is of hinged girder type; end spans are 20 m plus two cantilevers of 4 and 4.3 m, respectively; middle span which rests on inner cantilever of end spans is 12 m long; illustrated description of launching procedure.
Construction d'un pont en beton arme a Mytho (Cochinchine)
Construction d'un pont en beton arme a Mytho (Cochinchine)
Vsevolojsky, S. (author)
1947
4 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Relevement d'un pont en beton arme
Engineering Index Backfile | 1947
|MA-021 DIAGNOSTIC ET REPARATION D'UN PONT EN BETON ARME
British Library Conference Proceedings | 2002
|Note sur la construction d'un pont en beton arme, sur le Lot, a Luzech, AZES
Engineering Index Backfile | 1935