A platform for research: civil engineering, architecture and urbanism
Aluminum panels replace bridge's wooden deck
Cameron bridge, 16 ft wide, 660 ft span, across Little Colorado River between Arizona and Utah was built in 1912 with timber floor; second timber floor was laid in 1937; to withstand weight of constant truck traffic, timber floor was replaced by 3/8-in. gage aluminum panels 15 ft by 16 ft supported on steel stringers thus saving about 200 lb per ft of bridge.
Aluminum panels replace bridge's wooden deck
Cameron bridge, 16 ft wide, 660 ft span, across Little Colorado River between Arizona and Utah was built in 1912 with timber floor; second timber floor was laid in 1937; to withstand weight of constant truck traffic, timber floor was replaced by 3/8-in. gage aluminum panels 15 ft by 16 ft supported on steel stringers thus saving about 200 lb per ft of bridge.
Aluminum panels replace bridge's wooden deck
Construction Methods
Construction Methods ; 30
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Enhancing the Fatigue Life of Rio-Niteroi Bridge's Orthotropic Steel Deck
British Library Conference Proceedings | 1999
|Dynamic Response of Bridge's Deck due to Earthquake Vertical Component
British Library Conference Proceedings | 1999
|Bridge's Scour Monitoring System
Tema Archive | 2014
|Time—History Analysis of Bridge’s Deck Subjected to Vehicular Load Considering Road Roughness
Springer Verlag | 2022
|