A platform for research: civil engineering, architecture and urbanism
390 m long closed circuit blowdown tunnel made from electrically welded steel; report on tests carried out in tunnel; illustrations. See also Engineering Index 1951 p 1298. (See also - n 13 July 1 1951 p 241-7; similar description by J.BOYER in Nature (Paris) n 3197 Sept 1951 p 271-4; and description by G.BRUNER, in Aeroplane v 82 n 2116, 2118 Feb 8 1952 p 161-4, Feb 22 p 216-9)
390 m long closed circuit blowdown tunnel made from electrically welded steel; report on tests carried out in tunnel; illustrations. See also Engineering Index 1951 p 1298. (See also - n 13 July 1 1951 p 241-7; similar description by J.BOYER in Nature (Paris) n 3197 Sept 1951 p 271-4; and description by G.BRUNER, in Aeroplane v 82 n 2116, 2118 Feb 8 1952 p 161-4, Feb 22 p 216-9)
Large aerodynamic wind tunnel of Modane, brought to France after war from Austrian Tyrol
La soufflerie Paul Dumanois
Pierre (author)
Genie Civil ; 128
1951
6 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Austrian avalanches leave thousands isolated in Tyrol
British Library Online Contents | 1999
Tunnel Tyrol - Europe's Trilateral Megatunnel Project
British Library Conference Proceedings | 1993
|La soufflerie Paul Dumanois a Modane-Avrieux (Savoie)
Engineering Index Backfile | 1951
|British Library Online Contents | 2003
|