A platform for research: civil engineering, architecture and urbanism
Carter Lake tunnel of Colorado-Big Thompson Project designed for head of 235 ft; 4532 ft of tunnel is supported and 1260 ft unsupported; concrete for lining was compacted by immersion type air vibrators; about 1.0 cu ft of grout per ft of tunnel was placed behind lining which has minimum thickness of 5 1/2 in.
Carter Lake tunnel of Colorado-Big Thompson Project designed for head of 235 ft; 4532 ft of tunnel is supported and 1260 ft unsupported; concrete for lining was compacted by immersion type air vibrators; about 1.0 cu ft of grout per ft of tunnel was placed behind lining which has minimum thickness of 5 1/2 in.
Lining 8-ft pressure tunnel
Western Construction
Gelwix, M. (author)
Western Construction ; 27
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1941
|Wiley | 2012
|Wiley | 2008
|Concrete lining for large diameter pressure tunnel
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1953