A platform for research: civil engineering, architecture and urbanism
Importance of careful checking by roofing contractor of specifications relating to type and extent of coverage of roofing bond; roof insulation; type of base and cap flashing to be installed; photographs. (See also - n 9 June 1952 p 40-1, 100, 102)
Importance of careful checking by roofing contractor of specifications relating to type and extent of coverage of roofing bond; roof insulation; type of base and cap flashing to be installed; photographs. (See also - n 9 June 1952 p 40-1, 100, 102)
Factors in estimating built-up roofing
Sheet Metal Worker
Swenson, E.A. (author)
Sheet Metal Worker ; 43
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTIS | 1961
|Built-up roofing tension splits
Engineering Index Backfile | 1964
|Premature failure of built-up roofing
TIBKAT | 1963
|Premature failure of built-up roofing
Engineering Index Backfile | 1963
|Some engineering properties of built-up roofing
Engineering Index Backfile | 1964
|