A platform for research: civil engineering, architecture and urbanism
Building 1,000,000 Cu. Yd. fill -- Mostly in three months
Approach fills for new high level highway bridge over Roanoke River at Clarksville, Va; equipment consisted chiefly of diesel engined scrapers, Tournapulls, pushers, tractors, and rollers; main fill was built entirely from borrow material.
Building 1,000,000 Cu. Yd. fill -- Mostly in three months
Approach fills for new high level highway bridge over Roanoke River at Clarksville, Va; equipment consisted chiefly of diesel engined scrapers, Tournapulls, pushers, tractors, and rollers; main fill was built entirely from borrow material.
Building 1,000,000 Cu. Yd. fill -- Mostly in three months
Roads Streets
Roads and Streets ; 95
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building foundation of a 1,000,000 horsepower generating station
Engineering Index Backfile | 1926
|$1,000,000 bankhead highway improvement
Engineering Index Backfile | 1936
|$1,000,000 winter highway damage
Engineering Index Backfile | 1943
|Jointed discharge tunnel saves Memphis $1,000,000
Engineering Index Backfile | 1959
|Hoover Dam will provide 1,000,000 Hp
Engineering Index Backfile | 1931