A platform for research: civil engineering, architecture and urbanism
7.9-mi relocation through Tijeras Canyon, NM; project includes two divided 24-ft paved roadways; pavement consists of 3-in. compacted granular ballast, 1 1/2 in. of neat water bonded leveling course, 1 1/2 in. of hot plant processed asphaltic base, and 2 in. of hot plant processed surface course; description of aggregate plant and data on equipment used.
7.9-mi relocation through Tijeras Canyon, NM; project includes two divided 24-ft paved roadways; pavement consists of 3-in. compacted granular ballast, 1 1/2 in. of neat water bonded leveling course, 1 1/2 in. of hot plant processed asphaltic base, and 2 in. of hot plant processed surface course; description of aggregate plant and data on equipment used.
How well should we reconstruct?
Roads Streets
Dwyre, B.G. (author)
Roads and Streets ; 95
1952
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Soil freezing to reconstruct railway tunnel
Engineering Index Backfile | 1960
|Soil Freezing to Reconstruct a Railway Tunnel
ASCE | 2021
|