A platform for research: civil engineering, architecture and urbanism
Salem, Ore is completing 100-mg reservoir which is provided with lining of asphaltic concrete; reservoir is 2040 ft long on center line, 200 ft wide at bottom and 31 ft deep; crushed aggregate and from 10 to 11% of 60-70 penetration asphalt was used for mix; due to possibility of permeability, entire lining prior to placing was seal coated with catalytically blown asphalt cement.
Salem, Ore is completing 100-mg reservoir which is provided with lining of asphaltic concrete; reservoir is 2040 ft long on center line, 200 ft wide at bottom and 31 ft deep; crushed aggregate and from 10 to 11% of 60-70 penetration asphalt was used for mix; due to possibility of permeability, entire lining prior to placing was seal coated with catalytically blown asphalt cement.
100-mg. asphalt-lined reservoir
Western Construction
Geren, J.L. (author)
Western Construction ; 27
1952
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long Term Performance of an Asphalt Lined Upper Reservoir, Seneca Pumped Storage Project
British Library Conference Proceedings | 1997
|Sand-built reservoirs lined with asphalt
Engineering Index Backfile | 1957
A small concrete lined reservoir
Engineering Index Backfile | 1917
|Building small concrete-lined earth reservoir
Engineering Index Backfile | 1926
|Burbank's 7,000,000-gallon concrete lined reservoir
Engineering Index Backfile | 1928
|