A platform for research: civil engineering, architecture and urbanism
Land reclamation at Southampton
Historical data on Port of Southampton; recent development was 800-ft channel and rectification of Calshot Spit and Western Approach in accordance with turning radii of unusually large vessels now using Port; quantity of dredging was 3,500,000 cu yd; large quantities of dredged material was disposed into reclamation areas; data on reclamation jetty and pipe line.
Land reclamation at Southampton
Historical data on Port of Southampton; recent development was 800-ft channel and rectification of Calshot Spit and Western Approach in accordance with turning radii of unusually large vessels now using Port; quantity of dredging was 3,500,000 cu yd; large quantities of dredged material was disposed into reclamation areas; data on reclamation jetty and pipe line.
Land reclamation at Southampton
Civ Eng (Lond)
1952
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1996
|Online Contents | 2002
|Leaving dry land - LIPLINC from the Southampton Conference 1994
British Library Conference Proceedings | 1996
|