A platform for research: civil engineering, architecture and urbanism
How port met 1952 summer crisis due to sharp drop in foreign commerce and strike; $10,000,000 port improvement program; new ore unloading pier and new truck roadway, and unloading ramps at Locust Point, both for Baltimore and Ohio Railroad; second deck truck ramp extended ore pier; renovation of Cottman ore pier.
How port met 1952 summer crisis due to sharp drop in foreign commerce and strike; $10,000,000 port improvement program; new ore unloading pier and new truck roadway, and unloading ramps at Locust Point, both for Baltimore and Ohio Railroad; second deck truck ramp extended ore pier; renovation of Cottman ore pier.
Seaport of Baltimore
Naut Gaz
Stanton, J.L. (author)
Nautical Gazette ; 146
1952
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2002
|Engineering Index Backfile | 1897
Engineering Index Backfile | 1924
|Engineering Index Backfile | 1936
|Online Contents | 2017