A platform for research: civil engineering, architecture and urbanism
In September, 21 mo after start of construction, Washington Water Power Co operated first of four 50,000-kw generators at new Cabinet Gorge plant on Clark Fork River in northern Idaho; dam is variable radius concrete arch structure 208 ft high, 44 ft wide at base and 35 ft wide at top; 600 ft in length, it will impound water to depth of 110 ft above former water surface with 43,000 acre-ft of usable storage; construction details.
In September, 21 mo after start of construction, Washington Water Power Co operated first of four 50,000-kw generators at new Cabinet Gorge plant on Clark Fork River in northern Idaho; dam is variable radius concrete arch structure 208 ft high, 44 ft wide at base and 35 ft wide at top; 600 ft in length, it will impound water to depth of 110 ft above former water surface with 43,000 acre-ft of usable storage; construction details.
Job that couldn't be done -- But was
Elec West
Stearns, C. (author)
Electrical West ; 199
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building Where They Said It Couldn't Be Done!
British Library Conference Proceedings | 1998
|Rene Spada "So why couldn't it be done better?"
British Library Online Contents | 2003
|They Said It Couldn't Be Done - But Andy Anderson wasn't going to take that lying down...
Online Contents | 2004
|They Said it couldn't be done - An innovative diaphragm wall in "unconstructable" ground
Online Contents | 2002
They Said it couldn't be done An innovative diaphragm wall in "unconstructable" ground
British Library Online Contents | 2002