A platform for research: civil engineering, architecture and urbanism
Captain cook graving dock, Sydney
Dewatering, Excavations, Concrete Work and Backfilling, W.HUDSON and D.G.BRUCE; Building of Floating Caissons, J.P.SHIELDS; Fitting-out Wharf of Reinforced Concrete, 250-Ton Crane Foundations, and Docking Blocks, C.R.BICKFORD.
Captain cook graving dock, Sydney
Dewatering, Excavations, Concrete Work and Backfilling, W.HUDSON and D.G.BRUCE; Building of Floating Caissons, J.P.SHIELDS; Fitting-out Wharf of Reinforced Concrete, 250-Ton Crane Foundations, and Docking Blocks, C.R.BICKFORD.
Captain cook graving dock, Sydney
Instn Engrs Australia -- J
1952
41 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Captain Cook Graving Dock, Sydney
Engineering Index Backfile | 1947
|Captain cook graving dock, Sydney
Engineering Index Backfile | 1945
|Captain cook graving dock, Sydney
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1942
Engineering Index Backfile | 1945