A platform for research: civil engineering, architecture and urbanism
Closing fort Randall dam hydraulically
Method of making closure entailed hydraulic placement of combination sill and weir section of dredged chalk fill on top of previously blanketed riverbed, up to 1-ft above river level, then building diversion dam to safe height with dump trucks; all material in blanket, sill and weir pumped into place by 30-in. dredge.
Closing fort Randall dam hydraulically
Method of making closure entailed hydraulic placement of combination sill and weir section of dredged chalk fill on top of previously blanketed riverbed, up to 1-ft above river level, then building diversion dam to safe height with dump trucks; all material in blanket, sill and weir pumped into place by 30-in. dredge.
Closing fort Randall dam hydraulically
Eng News-Rec
Engineering News-Record ; 149
1952
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Underseepage control at Fort Randall Dam
Engineering Index Backfile | 1959
|Underseepage Control at Fort Randall Dam
ASCE | 2021
|