A platform for research: civil engineering, architecture and urbanism
Plans for Port of Amsterdam-Rhine Canal called for improving existing portion of Merwede Canal between Amsterdam and Utrecht and for excavating entirely new canal between Utrecht and Lek at Wijkbij-Duurstede and thence to Waal river at Tiel; total length of waterway, from Amsterdam to Tiel, 72 km; map, diagrams.
Plans for Port of Amsterdam-Rhine Canal called for improving existing portion of Merwede Canal between Amsterdam and Utrecht and for excavating entirely new canal between Utrecht and Lek at Wijkbij-Duurstede and thence to Waal river at Tiel; total length of waterway, from Amsterdam to Tiel, 72 km; map, diagrams.
Amsterdam-Rhine Canal
Dock Harbour Authority
vanAmerongen, C. (author)
1952
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Dutch plans for improving the ship canal from Amsterdam to the rhine river
Engineering Index Backfile | 1927
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1925
|Engineering Index Backfile | 1938