A platform for research: civil engineering, architecture and urbanism
Builder finds prestressing can be taken in stride
Two-lane highway bridge at Roseville, Ohio, consists of five 44-ft spans, made up of prestressed, precast T-beam; each span consists of nine 30-in. deep precast T-beams and cast in place deck slab bonded to beams; procedure of prestressing. (see also Concrete v 60 n 11 Nov 1952 p 18-20)
Builder finds prestressing can be taken in stride
Two-lane highway bridge at Roseville, Ohio, consists of five 44-ft spans, made up of prestressed, precast T-beam; each span consists of nine 30-in. deep precast T-beams and cast in place deck slab bonded to beams; procedure of prestressing. (see also Concrete v 60 n 11 Nov 1952 p 18-20)
Builder finds prestressing can be taken in stride
Eng News-Rec
Engineering News-Record ; 149
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Builder finds prestressing can be taken in stride
Engineering Index Backfile | 1952
Tactics: Georgia builder finds new storefront office/sales center draws buyers
Online Contents | 2012
Perfect Fit: Colorado builder finds success with small homes on big lots
Online Contents | 2011
British Library Online Contents | 1996
|How a Basingstoke builder finds the time to be an international darts celebrity
British Library Online Contents | 2004
|