A platform for research: civil engineering, architecture and urbanism
Repair of two bridges in Columbus, Ohio; concrete roadway of Grandview Avenue bridge was in bad condition and some of stringers needed replacement; Dodridge Street bridge had damaged timber stringers and strip flooring; repair of first bridge consisted of replacing flooring by two courses of hot mixed, hot laid asphaltic concrete; floor of second bridge replaced by steel stringers, welded to floor and two courses of bituminous surfacing.
Repair of two bridges in Columbus, Ohio; concrete roadway of Grandview Avenue bridge was in bad condition and some of stringers needed replacement; Dodridge Street bridge had damaged timber stringers and strip flooring; repair of first bridge consisted of replacing flooring by two courses of hot mixed, hot laid asphaltic concrete; floor of second bridge replaced by steel stringers, welded to floor and two courses of bituminous surfacing.
Modern rehabilitation methods for bridges
Pub Works
Elbin, G.H. (author)
Public Works ; 83
1952
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge engineering : [design, rehabilitation, and maintenance of modern highway bridges]
UB Braunschweig | 2006
|Bridge engineering : design, rehabilitation, and maintenance of modern highway bridges
UB Braunschweig | 1995
|Assessment and Rehabilitation of Steel Bridges - Experiences in Rehabilitation of Steel Bridges
Online Contents | 2002
|