A platform for research: civil engineering, architecture and urbanism
Methods employed to strengthen tunnel were as follows: placing of concrete invert and additional thickness of lining inside original lining, filling of cavities between natural soil and original lining, and pressure grouting; description of mixing and placing equipment and grouting.
Methods employed to strengthen tunnel were as follows: placing of concrete invert and additional thickness of lining inside original lining, filling of cavities between natural soil and original lining, and pressure grouting; description of mixing and placing equipment and grouting.
Turakin-Okoia railway deviation
New Zealand Eng
Kalaugher, E.D. (author)
1947
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Signalling and interlocking of Keadby deviation railway and bridge
Engineering Index Backfile | 1918
|Remediation method for operation railway bridge rescue channel deviation
European Patent Office | 2023
|Beam body jacking and deviation rectifying method for high-speed railway bridge
European Patent Office | 2020
|Tunnel construction and main line deviation on the Central Railway of Peru
Engineering Index Backfile | 1928
|Influence of Conversion Deviation on Dynamic Performance of High-Speed Railway Turnout
British Library Online Contents | 2011
|