A platform for research: civil engineering, architecture and urbanism
Six-foot sewer built on Mucky soil
Illustrated data on recently completed 72 in. diam sewer for pharmaceutical plant near Kalamazoo, Mich; sewer is built of asbestos bonded pipe; part of area had to be well pointed during sewer construction; pipe was fabricated in lengths of 10 and 18 ft.
Six-foot sewer built on Mucky soil
Illustrated data on recently completed 72 in. diam sewer for pharmaceutical plant near Kalamazoo, Mich; sewer is built of asbestos bonded pipe; part of area had to be well pointed during sewer construction; pipe was fabricated in lengths of 10 and 18 ft.
Six-foot sewer built on Mucky soil
Highway Mag
Highway Magazine ; 39
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Curing agent special for marine mucky soil and mucky soil foundation treatment method
European Patent Office | 2020
|Dynamic Property of Mucky Soil of Subgrade under Cyclic Load
British Library Conference Proceedings | 2010
|Foundation pit reinforcement construction method for mucky soil layer
European Patent Office | 2022
|Dynamic consolidation and drainage construction method for mucky soil
European Patent Office | 2015
|