A platform for research: civil engineering, architecture and urbanism
Illustrated description of design and construction of dock; investigation of foundation; approximately 393,000 cu yd of stone were crushed on site; data on concrete and caissons (sliding and floating); pressure grouting and steel sheet pile cofferdam illustrations of typical construction stages. (See also Instn Civ Engrs -- J v 28 n 8 Oct 1947 p 328-53 (discussion) p 354-74 10 supp plates)
Illustrated description of design and construction of dock; investigation of foundation; approximately 393,000 cu yd of stone were crushed on site; data on concrete and caissons (sliding and floating); pressure grouting and steel sheet pile cofferdam illustrations of typical construction stages. (See also Instn Civ Engrs -- J v 28 n 8 Oct 1947 p 328-53 (discussion) p 354-74 10 supp plates)
Sturrock Graving Dock, Cape Town
S African Instn Civ Engrs -- Proc
Paterson, D.E. (author)
1947
27 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sturrock Graving dock, Cape Town
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1942
Engineering Index Backfile | 1945
Closure on Nagasaki Graving Dock
ASCE | 2021
|Discussion on Nagasaki Graving Dock
ASCE | 2021
|