A platform for research: civil engineering, architecture and urbanism
10 mph slow order bridge replaced by modern double track steel structure for 100-mph traffic; new deck truss bridge is 540 ft long, consisting of two 120-ft approach spans, and 300-ft, two hinged center arch; design is of Pratt truss style; preparation of canyon walls by grouting into drilled holes; illustrated description. (see also unsigned description in Western Construction News v 23 n 6 June 1948 p 101-4)
10 mph slow order bridge replaced by modern double track steel structure for 100-mph traffic; new deck truss bridge is 540 ft long, consisting of two 120-ft approach spans, and 300-ft, two hinged center arch; design is of Pratt truss style; preparation of canyon walls by grouting into drilled holes; illustrated description. (see also unsigned description in Western Construction News v 23 n 6 June 1948 p 101-4)
Santa Fe Again Tames Canyon Diablo
Santa Fe Again Tames Canyon Diablo
Sandberg, C.H. (author)
Railway Age ; 123
1947
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Santa Fe Again Tames Canyon Diablo
Engineering Index Backfile | 1948
|Report from Diablo Canyon (Auxiliary Transformer Catastrophic Failure and Fire)
British Library Conference Proceedings | 1997
|Research tames anti-social bogie
IuD Bahn | 2011
|AASHTO's SiteManager Tames Contract Documentation
Online Contents | 1998
|AASHTO's SiteManager Tames Contract Documentation
British Library Online Contents | 1998
|