A platform for research: civil engineering, architecture and urbanism
Loriol retaining dam is 7 km upstream from power plant; water is conducted to plant by 7-km, 200-m wide, 10-m deep navigable canal providing 13-m head, and comprising 12-m wide lock at power plant; six turbine units produce total of 200,000 kw.
Loriol retaining dam is 7 km upstream from power plant; water is conducted to plant by 7-km, 200-m wide, 10-m deep navigable canal providing 13-m head, and comprising 12-m wide lock at power plant; six turbine units produce total of 200,000 kw.
Construction details of Baix-le-Logis Neuf hydroelectric power plant of Rhone Valley scheme
Les travaux d'amenagement de la chute de Baix-le-Logis Neuf
Gres, G. (author)
Genie Civil ; 136
1959
8 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of Baix-le-Logis Neuf on Rhone river
Engineering Index Backfile | 1959
|Civil engineering aspects of Baix-le-Logis-Neuf power plant on Rhone River
Engineering Index Backfile | 1959
|Baix le Logis Neuf Development
Engineering Index Backfile | 1960
|Moerel hydroelectric power plant on Rhone River, Switzerland
Engineering Index Backfile | 1946
|Hydroelectric power plant and dam under construction on Rhone river at Geneva
Engineering Index Backfile | 1942
|