A platform for research: civil engineering, architecture and urbanism
Process of excavating pits or trenches with vertical impermeable walls by means of mud circulation during drilling
Use of rotary drilling rig mounted on tracks above trench; rig is moved back and forth each time excavating some 60 to 150 cm of ground.
Process of excavating pits or trenches with vertical impermeable walls by means of mud circulation during drilling
Use of rotary drilling rig mounted on tracks above trench; rig is moved back and forth each time excavating some 60 to 150 cm of ground.
Process of excavating pits or trenches with vertical impermeable walls by means of mud circulation during drilling
Procedimiento para hacer excavaciones en pozos o zanjas con paredes verticales impermeables, por medio de la circulacion de fango durante el barrenado
Menendez, J. (author)
1958
11 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Comments on methods of excavating trenches and ditches
Engineering Index Backfile | 1909
European Patent Office | 2019
|Stability of vertical walls of trenches under hydrostatic heads
Online Contents | 1973
|Cutting type constructing method for excavating rock foundation pits in construction site
European Patent Office | 2015
|Ventilation drying in walls with vapor impermeable claddings
British Library Conference Proceedings | 2006
|