A platform for research: civil engineering, architecture and urbanism
Attempt made in design to utilize precast and in situ concrete each in field for which it is best suited: bridge has clear span of 40 ft; principal members are 6 ribs with 5 precast concrete components; deck is slab constructed in situ.
Attempt made in design to utilize precast and in situ concrete each in field for which it is best suited: bridge has clear span of 40 ft; principal members are 6 ribs with 5 precast concrete components; deck is slab constructed in situ.
Precast concrete road bridge
Surveyor
Blackmore, W.E. (author)
1947
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTIS | 1994
Precast concrete bridge construction
Engineering Index Backfile | 1944
|Modular precast concrete bridge
British Library Online Contents | 2007
|