A platform for research: civil engineering, architecture and urbanism
Construction of tunnel and terminal for Canadian railway at Montreal; tunnel is 16,315 ft. long and its construction required the excavation of 422,358 cu. yd. of rock.
Construction of tunnel and terminal for Canadian railway at Montreal; tunnel is 16,315 ft. long and its construction required the excavation of 422,358 cu. yd. of rock.
The Mount Royal tunnel
Jl. Eng. Inst. Canada
Busfield, J.L. (author)
1919
32 pages
40 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1917
|Engineering Index Backfile | 1946
|Precise surveys for Mount Royal tunnel
Engineering Index Backfile | 1913
|Completing the Mount Royal tunnel into Montreal
Engineering Index Backfile | 1915
Upgrading Mount Royal Tunnel to Latest Standards
British Library Conference Proceedings | 2021
|