A platform for research: civil engineering, architecture and urbanism
Miami flood works involve radical railway changes
Railways crossing flood-retarding basins shifted to high ground. Levees guard stretches crossing low-lying areas.
Miami flood works involve radical railway changes
Railways crossing flood-retarding basins shifted to high ground. Levees guard stretches crossing low-lying areas.
Miami flood works involve radical railway changes
Eng. News-Rec
1919
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction camps model towns on Miami flood works
Engineering Index Backfile | 1918
Flood control in the Miami valley
Engineering Index Backfile | 1917
|Flood Control in the Miami Valley, Ohio
ASCE | 2021
|Sixteen years of flood control in Miami Valley
Engineering Index Backfile | 1938
|