A platform for research: civil engineering, architecture and urbanism
Four concrete overhead arch bridges on Toronto-Hamilton highway
Governing factor in design of bridges has been long clearances by using parabolic overhead arch ribs braced together by horizontal bracing members.
Four concrete overhead arch bridges on Toronto-Hamilton highway
Governing factor in design of bridges has been long clearances by using parabolic overhead arch ribs braced together by horizontal bracing members.
Four concrete overhead arch bridges on Toronto-Hamilton highway
Contract Rec
1919
6 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Toronto-Hamilton highway construction
Engineering Index Backfile | 1915
Completion of Toronto-Hamilton highway
Engineering Index Backfile | 1917
|The construction of the Toronto-Hamilton highway
Engineering Index Backfile | 1921
|Construction methods on the Toronto and Hamilton highway
Engineering Index Backfile | 1916
|Overhead highway arch of artistic design
Engineering Index Backfile | 1913
|