A platform for research: civil engineering, architecture and urbanism
Welding operation going on at Bound Brook, N. J.; points to wide field of usefulness for structural welding; alterations brings out cost saving advantages of welding; reviews briefly several completed structures; Sharon Building; one-story kiln tunnel building of Westinghouse Co.; 55-ft. span plategirder bridge; Chicopee Falls Bridge. Paper presented before joint meeting of Am. Soc. Civil Engrs. and Am. Welding Soc. (See also Am. Welding Soc. -- Jl vol. 7, no. 6, June 1928 pp. 54-58, 3 figs)
Welding operation going on at Bound Brook, N. J.; points to wide field of usefulness for structural welding; alterations brings out cost saving advantages of welding; reviews briefly several completed structures; Sharon Building; one-story kiln tunnel building of Westinghouse Co.; 55-ft. span plategirder bridge; Chicopee Falls Bridge. Paper presented before joint meeting of Am. Soc. Civil Engrs. and Am. Welding Soc. (See also Am. Welding Soc. -- Jl vol. 7, no. 6, June 1928 pp. 54-58, 3 figs)
Arc welded buildings and bridges
Baltimore Engr
Fish, G.D. (author)
1928
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Arc welded buildings and bridges
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1959
Engineering Index Backfile | 1946
Welded interstate highway bridges
TIBKAT | 1960
|Welded interstate Highway Bridges
UB Braunschweig | 1960
|