A platform for research: civil engineering, architecture and urbanism
Mokelumne river project progressing well in advance of pre-determined schedule
Largest municipal water project in entire West involving 40 million dollar construction program rapidly nears completion; use of protective paint; automatic features; Pardee dam gravity section allowing for about 25 per cent uplift at heel diminishing to zero at toe; development of power; power house will be at base of dam and 15, 000 kw. will be installed; gravel and sand for concrete; balancing reservoirs; distribution system.
Mokelumne river project progressing well in advance of pre-determined schedule
Largest municipal water project in entire West involving 40 million dollar construction program rapidly nears completion; use of protective paint; automatic features; Pardee dam gravity section allowing for about 25 per cent uplift at heel diminishing to zero at toe; development of power; power house will be at base of dam and 15, 000 kw. will be installed; gravel and sand for concrete; balancing reservoirs; distribution system.
Mokelumne river project progressing well in advance of pre-determined schedule
Hydraulic Eng
Davis, A.P. (author)
1928
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Mokelumne system is gigantic project
Engineering Index Backfile | 1928
|Mokelumne Aqueduct Seismic Upgrade Project
British Library Conference Proceedings | 1995
|ENGINEERING, CONSTRUCTION, & INSTALLATION - CLOV project progressing on schedule
Online Contents | 2013
The mokelumne river water supply project for the east bay municipal utility district, California
Engineering Index Backfile | 1928
|