A platform for research: civil engineering, architecture and urbanism
Sliding forms build double walls at high speed
Four six-story walls concreted in 12 1/2 days, using 800 ft. of forms rising 4 in. an hour; speed of pouring and exposing concrete walls in cold-weather illustrated in cold-storage plant at Cleveland, Ohio; building is 200 ft. square and 94 ft. high; concrete was exposed within nine hours after it was poured.
Sliding forms build double walls at high speed
Four six-story walls concreted in 12 1/2 days, using 800 ft. of forms rising 4 in. an hour; speed of pouring and exposing concrete walls in cold-weather illustrated in cold-storage plant at Cleveland, Ohio; building is 200 ft. square and 94 ft. high; concrete was exposed within nine hours after it was poured.
Sliding forms build double walls at high speed
Eng. News-Rec
Engineering News Record ; 100
1928
3 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Method of constructing concrete walls with sliding forms
Engineering Index Backfile | 1911
Enclose, build : walls, facade, roof
UB Braunschweig | 2015
|Double Shields to Build the High Speed Railway Network in Spain
British Library Conference Proceedings | 2005
|