A platform for research: civil engineering, architecture and urbanism
Second Musconetcong tunnel nears completion
Nov 1928 n 11 p 2567-2572.: Shows progress made since 1872 is devising mechanical aids for engineers and contractors; new tunnel in New Jersey is 4900 ft. long; lined sections are 30 ft. wide and 25 1/2 ft. above base of rails at crown of arch. Dec 1928 n 12 p 2605-2609: Modern methods and means used in driving and lining new tunnel show advances made in 50 years; driving old Musconetcong tunnel.
Second Musconetcong tunnel nears completion
Nov 1928 n 11 p 2567-2572.: Shows progress made since 1872 is devising mechanical aids for engineers and contractors; new tunnel in New Jersey is 4900 ft. long; lined sections are 30 ft. wide and 25 1/2 ft. above base of rails at crown of arch. Dec 1928 n 12 p 2605-2609: Modern methods and means used in driving and lining new tunnel show advances made in 50 years; driving old Musconetcong tunnel.
Second Musconetcong tunnel nears completion
Compressed Air Mag
Skerrett, R.G. (author)
1928
38 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long Capitol tunnel nears completion
Engineering Index Backfile | 1953
Holland's privately financed Noord tunnel nears completion
Elsevier | 1991
Engineering Index Backfile | 1954
Extensive tunnel work on C. and O. nears completion
Engineering Index Backfile | 1932
Limestone airbase nears completion
Engineering Index Backfile | 1949